SUWANEE, Georgia - August 2017 - One of Mitsubishi Electric’s top Case Studies on the Oklahoma City Olympic Training Facility that utilized VRF in its renovation and rebuild was featured in HPAC Engineering’s August issue. The two-page color spread highlighted integrated controls, savings on operational costs and other benefits for facility managers.